Downhole Pressure and Temperature Survey Analysis for Intermittent Gas Lift Wells: A Case Study in Assam Arakan Basin

Downhole Pressure and Temperature Survey Analysis for Intermittent Gas Lift Wells: A Case Study in Assam Arakan Basin Abstract: Gas lift is the major artificial lift method for the wells of brownfields in the Assam Arakan Basin. It is the best suited method for maintaining and extending the current production rate of the fields. In […]

Downhole Pressure and Temperature Survey Analysis for Intermittent Gas Lift Wells: A Case Study in Assam Arakan Basin Read More