Case-Study-Comparing-Wall-Loss-Measurements-in-Production-Tubing

In this case study, an oil well was operated until failure with 20 joints of new boronized tubing installed just above the pump with new untreated L80 tubing installed above the boronized tubing. A 24-arm caliper measuring tool on a wireline was used to measure wall loss from the bottom of the tubing string to […]

Case-Study-Comparing-Wall-Loss-Measurements-in-Production-Tubing Read More

Case-Study-Comparing-Wall-Loss-Measurements-in-Production-Tubing

In this case study, an oil well was operated until failure with 20 joints of new boronized tubing installed just above the pump with new untreated L80 tubing installed above the boronized tubing. A 24-arm caliper measuring tool on a wireline was used to measure wall loss from the bottom of the tubing string to […]

Case-Study-Comparing-Wall-Loss-Measurements-in-Production-Tubing Read More