As many as 10% of Laramie Energy, LLC’s wells were non‐producing or under‐producing due to deep‐set tubing or mechanical restrictions in tubing or casing. A program of evaluating existing completions followed by tubing perforation and reestablishment of plunger lift was undertaken to restore economically viability to these wells.

File Type: pdf
Categories: Plunger Lift Systems (PLS)
Tags: Abstract
Author: Dan Fouts - Peak Oil & Gas, David Green - Well Master Corp
Downloads: 8