Coordinated Tubing Pressure and Pump Speed Control for ESP GVF Optimization in the Permian Basin
This paper presents a field-validated autonomous control framework that coordinates tubing pressure and pump speed to actively manage gas void fraction (GVF) at the ESP pump intake, reducing hydraulic instability and unplanned shutdowns in multiphase flow conditions. By treating tubing pressure as a dynamic control variable — maintained within 5–10 psi of setpoint with sub-100ms valve response — the system continuously analyzes sensor data to identify and respond to gas interference without human intervention. Across an 8-well study in the Permian Basin, coordinated setpoint management delivered an average 10% increase in oil production per day compared to conventional static control.